Construction of a Photovoltaic Plant in Calanga – Maputo – Manhiça District
Client:
Fundo Nacional da Energia (FUNAE)
Location:
Maputo (Manhiça District – Calanga)
Date:
July, 2019
Project Description:
In Mozambique there are several areas that are yet to be developed and explored, some of which do not have any electrical current present. One of these areas is located in the Calanga head office administrative post, east of the Manhiça village and the area needs to be electrified. MATEMO is responsible for constructing a Photovoltaic Plant that will provide the area with clean renewable energy using solar panels and many other resources of the plant.